Boiler installation-Agnico-Eagle – Meadowbank division

Client: Agnico-Eagle – Meadowbank division

Project: Boiler 800 HP installation to overcome electrical shutdowns. The boiler 800 HP allows glycol heating, which in turn services all buildings.

Achievements:

  • Design and process engineering 
  • Structural design
  • Mechanical installation of boiler 800 HP
  • Piping installation for glycol
  • Installation and connection of piping for fuel
  • Chimney installation
  • Lifting plans design
  • Risk management
 
 
  • Photo 1
  • Photo 2
  • Photo 3
  • Photo 4
  • Photo 5