Realizations - ABF Artic

Please find below a few of our achievements.

 

Process piping on concentrator- Agnico-Eagle-Meadowbank division

Mandate: To install process piping on nickel concentrator, from grinder to tailings facility.
 
 

Installation of gyratory crusher-Agnico-Eagle-Meadowbank division

Mandate: To install a gyratory crusher at the Meadowbank site for increased production.
 
 
 

Boiler installation-Agnico-Eagle – Meadowbank division

Mandate: To install a boiler of 800 HP to overcome electrical shutdowns.
 
 

Heat recovery system-Agnico-Eagle – Meadowbank division

Mandate: To install a heat recovery system with plate exchanger.